Skip to content
Actentis

Caso · Reported 15% reduction in energy spend

Contextualized energy consumption at a building materials plant

Electricity, gas, LPG and water linked to line, shift and product.

Problem
Energy spend kept rising with no explanation by line, shift or product.
Context
Multinational building materials company. Confidential client.
Period
To be confirmed
Assets covered
Plant electricity, gas, LPG and water consumption. Metering point details to be confirmed.
Role of each brand
Actentis: energy management software. Axenova's role in metering and connectivity: to be confirmed.
Solution applied
Consumption put in context by line, shift and product, with KPIs and deviation alerts.
Baseline
To be confirmed
Measurement method
To be confirmed
Result
Reported 15% reduction in energy spend. Period, baseline and scope to be confirmed.
Limitations
The result depends on the actions taken by the plant team; it cannot be extrapolated to other facilities without an assessment.