Caso · Reported 15% reduction in energy spend
Contextualized energy consumption at a building materials plant
Electricity, gas, LPG and water linked to line, shift and product.
- Problem
- Energy spend kept rising with no explanation by line, shift or product.
- Context
- Multinational building materials company. Confidential client.
- Period
- To be confirmed
- Assets covered
- Plant electricity, gas, LPG and water consumption. Metering point details to be confirmed.
- Role of each brand
- Actentis: energy management software. Axenova's role in metering and connectivity: to be confirmed.
- Solution applied
- Consumption put in context by line, shift and product, with KPIs and deviation alerts.
- Baseline
- To be confirmed
- Measurement method
- To be confirmed
- Result
- Reported 15% reduction in energy spend. Period, baseline and scope to be confirmed.
- Limitations
- The result depends on the actions taken by the plant team; it cannot be extrapolated to other facilities without an assessment.