Caso · Full line shutdown avoided
Early detection of shaft eccentricity in a critical motor
The spare part was ordered three months in advance and a line shutdown was avoided.
- Problem
- A critical motor with an imported spare part could stop the entire line if it failed.
- Context
- Industrial plant. Confidential client.
- Period
- To be confirmed
- Assets covered
- The line's critical motor. Other monitored assets to be confirmed.
- Role of each brand
- Actentis: predictive maintenance software. Axenova's role in sensors and installation: to be confirmed.
- Solution applied
- Condition monitoring with an early shaft eccentricity alert and an intervention recommendation.
- Baseline
- To be confirmed
- Measurement method
- To be confirmed
- Result
- The spare part was ordered from Germany three months in advance and the intervention was planned, avoiding a full line shutdown.
- Limitations
- A single case on one asset. It does not mean every failure can be anticipated.