Caso · Full line shutdown avoided

Early detection of shaft eccentricity in a critical motor

The spare part was ordered three months in advance and a line shutdown was avoided.

Problem
A critical motor with an imported spare part could stop the entire line if it failed.
Context
Industrial plant. Confidential client.
Period
To be confirmed
Assets covered
The line's critical motor. Other monitored assets to be confirmed.
Role of each brand
Actentis: predictive maintenance software. Axenova's role in sensors and installation: to be confirmed.
Solution applied
Condition monitoring with an early shaft eccentricity alert and an intervention recommendation.
Baseline
To be confirmed
Measurement method
To be confirmed
Result
The spare part was ordered from Germany three months in advance and the intervention was planned, avoiding a full line shutdown.
Limitations
A single case on one asset. It does not mean every failure can be anticipated.